Browse Items (949 total)

  • Collection: VSF Forestry Lantern Glass Slide Collection

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc928s-00001.jpg
Bullock team hauling logs to a sawmill in the Rubicon forest, Alexandra.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc926s-00001.jpg
Cletrac tractor with angle blade and canopy clearing a fire break.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc924s-00001.jpg
F.C. Power grader clearing fire break and track

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc923s-00001.jpg
Wilson's Promontory on old track to Sealer's Cove

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc922s-00001.jpg
Egypt poles - creolatum on ends

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc921s-00002.jpg
A Caterpillar D4 tractor in Britain. These were used by the Forests Commission of Victoria in the 1940s.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc920s-00001.jpg
Timber destruction following repeated fires on the Tooronga Plateau, Neerim District.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc919s-00001.jpg
A caterpillar D6 tractor using a winch to haul logs into a sawmill.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc918s-00001.jpg
Part of logging and loading, rig in ash country. Thomson Valley

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc913s-00001.jpg
Loading logs from trawler to mill

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc912s-00001.jpg
Powelltown tramway c1916 "Powellite" loading logs from landing serviced by a horse drawn tramway on the line up to the Bump prior to the construction of the Big Bridge. (See page 30 of book Powelltown published by LRRSA)

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc912a-00001.jpg
This is a close up of a log that has been brought to the train line by horse teams. The worker is removing the large nails used to fix the log fro dragging by the team.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc909s-00001.jpg
This is the diagram for the North Bend Skyline and High Lead Logging system.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc908s-00001.jpg
This is a diagram of the process and path for a haulage Track distribution system.

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc907s-00001.jpg
Old Style fencing

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc907a-00001.jpg
A Selector cutting posts for fencing

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc904s-00001.jpg
Eucalyptus Regnans Sherbrooke , girth 53' coloured slide

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc901s-00001.jpg
Initial bench breakout for Road Construction as left by Bulldozer and ready for the grader. Neerim District

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc900s-00001.jpg
Forestry Company men on the job. England

https://i1.wp.com/peegafilms.files.wordpress.com/2017/05/cchc898s-00001.jpg
Cook at Delatite Camp (M.B. Water Supply)
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2